(In progress) Suspended concrete garage construction in Fairlight

suspended concrete garage construction

A suspended concrete garage and car turntable solves a myriad of parking problems.

The construction of a suspended concrete garage, driveway and car turntable has proved to be an innovative solution for the owners of the Harbourside property on Sydney’s Northern Beaches.

Located in Fairlight and backing onto North Harbour, this project presented a unique set of challenges for our experienced team.

This project undoubtedly showcases our ability to intersect engineering innovation with practical solutions.

STAGE 1

A unique set of parking challenges.

When garage access was revoked to create a public pathway at the rear of the property, the owners were confronted with a unique set of challenges that would solve their newly created parking and garaging dilemma.

Previously, the owners crossed public land to gain access to their garage and off-street parking.  When this was converted into to a public pathway, removing access to the garage, an innovative solution had to be sought.

The solution was to utilise an existing driveway that was shared with a unit block next door and provide access to a new garage at the top of the property.

While this solved the access problem, the shared driveway was very narrow and could only accommodate one car at a time.  The steep slope of the property also meant there was only enough room for the garage, without space for cars to turn around.

The solution… a car turntable!

The car turntable will allow the owners to drive, safely and directly, into the new garage and then use the turntable to turn their car around, without having to a complete a difficult multiple-point turn.

Innovative engineering of a suspended concrete slab garage.

The new suspended garage is designed to be an engineering masterpiece.

The narrow site and steep terrain required extensive excavation before we could begin construction.

Once excavation was completed, we installed Dincel retaining walls to secure the steep embankment and provide long-lasting structural support.

The new suspended garage will be supported by 6-metre high concrete columns, connecting it to the communal driveway.

A large storage area will be added behind the garage.

Garden landscaping and stair access.

Once the garage structure is complete, the area in front will undergo a transformation with landscaping and terracing.

Extensive Dincel retaining walls will be used to manage the steep terrain, cleverly concealed the steel excavated wall of soil.

And finally, the installation of a 6.5-metre concrete staircase that will connect the street and garage to the backyard.


suspended concrete garage construction
Above: Reinforced concrete columns ready for concrete. These will anchor the structure and safely support the new dual garage above the sloping site.
STAGE 2

Construction update. Progress continues to June 2025.

We’ve returned to site at this challenging Fairlight property to continue the next phase of construction — the 40-metre steep concrete driveway, suspended dual garage slab, and car turntable installation.

With excavation and foundational work now complete, our focus has shifted to forming the suspended concrete slab and supporting driveway. Reinforced concrete columns are now in place to anchor the structure and safely support the new dual garage above the sloping site.

A car turntable for safe and functional access

Because of the steep gradient and narrow layout, a car turntable remains a vital part of the design. Once vehicles reach the garage, there’s no room to perform a multi-point turn. Reversing up the 40-metre drive would be not only impractical, but unsafe.  With limited traction, most vehicles would struggle to ascend without wheel spin or losing control. The car turntable will allow for a simple, safe turnaround without compromising space or safety.

Crash barrier installed for maximum safety

At the sharp bend leading to the garage, we’ve commenced work on an exceptionally robust concrete crash barrier. Standing 1 metre high and 300mm wide, this barrier is specifically engineered to stop vehicles in the unlikely event of brake failure, preventing cars from careening off the steep drive into the house below. This safety feature is a critical part of the overall design given the steep site conditions.

Next steps: Concrete stairs leading down to the house.

Once the garage and driveway construction is complete, we’ll being work on the concrete stairs leading down to the home. These stairs will provide between the garage and the house below.

Check back shorlty as this highly technical project continues to take shape…


Northern Beaches concreting

For all concreting and formworking projects, including suspended garages and car turntables, on the Northern Beaches, contact us for a competitive quote.  With 40+ years of concreting experience, we bring extensive knowledge to any concrete and formwork project – including emergency and after hours jobs.  We provide a high level of services and workmanship on all our projects, with attention to detail and a professional approach to every job. We are a friendly team, focused on our customers’ needs and satisfaction and getting the job done.